PT. PRO ENGINEERING UTAMA
  • Home
  • Our Product
    • Shop
  • Our Service
    • Fire Pump Installation & Maintenance
    • Fire Protection & Hydrant System
    • Fire Alarm & Detection System
    • Fire Truck & Emergency System Service
  • News
  • About Us
  • Contact Us
0
Long Term Services Agreement Mechanical Fire Equipment- PT Pertamina Patra Niaga RU III Area Plaju-Sungai Gerong
April 24, 2026

Fire Pump Repair Services – PT. Indah Kiat Pulp & Paper

Fire Pumps Repair Services – PT. Indah Kiat Pulp & Paper Perawang

On March 6th 2026,  PT Pro Engineering Utama Carrying out repairs to 1 unit of fire pump ST-04B PT INDAH KIAT PULP PERAWANG, Repair work was carried out on 1 (one) unit of fire pump with tag number ST-04B located at PT. Indah Kiat Pulp & Paper, Perawang. The activity aimed to restore the pump’s performance and ensure compliance with fire protection system requirements.

Scope of Work

The scope of work included detailed inspection, fault identification, and corrective repair of the fire pump system. Activities covered mechanical and operational checks such as pump alignment, coupling condition, lubrication system, and verification of associated components. Any defective or worn parts identified during inspection were repaired or replaced to meet operational standards.

Inspection and Findings

Initial inspection indicated that the fire pump experienced performance degradation, which required corrective maintenance. Observations included irregular operation parameters and component wear. Further evaluation was conducted to determine the root cause and ensure all deficiencies were addressed in accordance with NFPA guidelines. Corrective actions were implemented, including necessary repairs, component adjustments, and system recalibration. All work was carried out following standard procedures and in line with NFPA 20 recommendations for fire pump systems.

Testing and Commissioning

Upon completion of repairs, functional testing was conducted to verify pump performance. The fire pump was tested under operational conditions to confirm that pressure, flow, and overall system response met the required performance criteria. Based on the inspection, repair, and testing results, the fire pump unit ST-04B is now operating within acceptable parameters and is considered ready for service. The system is deemed compliant with applicable standards and suitable to support the facility’s fire protection system.

Share

Related posts

KODAK Digital Still Camera

April 24, 2026

Long Term Services Agreement Mechanical Fire Equipment- PT Pertamina Patra Niaga RU III Area Plaju-Sungai Gerong


Read more
February 23, 2026

Installation Tornatech Diesel Panel – PT Kalbe Morinaga Cikampek


Read more
February 17, 2026

Replacing New Battery Charger Tornatech Diesel Panel – Majalengka


Read more

Office
Ruko Palais de Paris Blok F2 No 12
Deltamas Cikarang Pusat Bekasi Jawa Barat
Indonesia 17530
Tel : (021) 89383685
Fax : (021) 29082419
Whatsapp : +62 878 8887 6666

Our Service
Fire Service
Water Work & Irrigation
Residential & Commercial Building Service
Automotive

© 2025 PT. PRO ENGINEERING UTAMA. All Rights Reserved.
    0