PT. PRO ENGINEERING UTAMA
  • Home
  • Our Product
    • Shop
  • Our Service
    • Fire Service
    • Water Works & Irrigations
    • Residential and Commercial Building Service
    • Automotive
  • News
  • About Us
  • Contact Us
0
Preventive Maintenance Diesel Fire Pump – PT Doulton
August 8, 2024
Maintenance Fire Pump – PT. PLN Enjiniring CGN Plant Bangkanai, Muara Teweh
October 12, 2024

Performance Test Fire Pump on Drillship NS Zonda – Singapore

On October 3, 2024, PT. Pro Engineering Utama successfully conducted a performance test on the fire pump of Drillship NS Zonda, owned by Ventura Offshore, while it was anchored in the Singapore Strait. The performance test was carried out in compliance with NFPA 25 regulations, which set standards for the inspection, testing, and maintenance of water-based fire protection systems.

Purpose of Performance Testing

The primary objectives of conducting a performance test for fire pumps on ships, including drillships, are as follows:

  1. Ensuring Operational Readiness: Verifying that the fire pump is fully functional and capable of delivering the required water flow and pressure in case of a fire emergency.

  2. Compliance with NFPA Standards: Meeting regulatory requirements under NFPA 25 to ensure adherence to international maritime safety and fire protection standards.

  3. Detecting Performance Issues: Identifying potential mechanical issues, wear, or inefficiencies that could hinder the pump’s performance.

  4. Enhancing Safety Measures: Ensuring the safety of the vessel, crew, and cargo by maintaining a reliable fire protection system.

  5. Preventive Maintenance Planning: Providing data for future maintenance needs and ensuring components are operating within their optimal ranges.

Scope of Work

The performance test included:

  1. Flow and Pressure Testing – Measuring the pump’s ability to deliver water at specified flow rates and pressures.

  2. Motor and Pump Performance Check – Assessing the operational stability and efficiency of the motor and pump under load.

  3. System Calibration and Adjustment – Ensuring accurate settings and calibration for optimal performance.

  4. Safety System Testing – Verifying the functionality of safety features, including automatic start/stop mechanisms.

  5. Deluge System Testing – Conducting tests on the deluge system to verify its functionality and readiness in case of emergencies.

  6. Electrical Testing – Performing measurements on the electric pump, including motor voltage, motor amperage, and efficiency evaluation.

Commitment to Quality and Safety

PT. Pro Engineering Utama is committed to providing high-quality inspection, testing, and maintenance services for fire protection systems. Our goal is to help businesses comply with safety standards while ensuring that fire pumps operate efficiently and reliably under all conditions.

For more information about this performance test or to schedule an inspection, please contact PT. Pro Engineering Utama through the provided contact details.

Share

Related posts

December 30, 2024

Replacement Diesel Fire Pump Controller – AirNav Indonesia


Read more
December 18, 2024

Maintenance Fire Pump – PT. Apical Kao Chemicals, Dumai


Read more
December 11, 2024

Repair of Fire Truck Rosenbauer RU III Plaju


Read more

Office
Ruko Palais de Paris Blok F2 No 12
Deltamas Cikarang Pusat Bekasi Jawa Barat
Indonesia 17530
Tel : (021) 89383685
Fax : (021) 29082419
Whatsapp : +62 878 8887 6666

Our Service
Fire Service
Water Work & Irrigation
Residential & Commercial Building Service
Automotive

© 2025 PT. PRO ENGINEERING UTAMA. All Rights Reserved.
    0