PT. PRO ENGINEERING UTAMA
  • Home
  • Our Product
    • Shop
  • Our Service
    • Fire Service
    • Water Works & Irrigations
    • Residential and Commercial Building Service
    • Automotive
  • News
  • About Us
  • Contact Us
0
Performance Test Fire Pump on Drillship NS Zonda – Singapore
October 3, 2024
Inspection Fire Pump Pollux Habibie Meisterstadt Apartement – Batam
December 4, 2024

Maintenance Fire Pump – PT. PLN Enjiniring CGN Plant Bangkanai, Muara Teweh

On October 12, 2024 PT. Pro Engineering Utama carried out maintenance work on the diesel fire pump at PT. PLN Enjiniring CNG Plant in Bangkanai, Muara Teweh. The maintenance activities were performed to ensure the optimal performance and reliability of the fire protection system, in compliance with NFPA 25 regulations for fire pump maintenance.

Scope of Work

The maintenance tasks included:

  1. Replacement of Pressure Cap Heat Exchanger – Ensuring proper pressure regulation in the cooling system.

  2. Replacement of Hose Reducer Heat Exchanger – Maintaining efficient coolant flow within the heat exchanger.

  3. Replacement of Hose HE to Thermostat HSG – Ensuring reliable coolant circulation.

  4. Replacement of Thermostat – Regulating engine temperature to prevent overheating.

  5. Replacement of Fuel Filter – Ensuring clean fuel delivery and preventing blockages.

  6. Replacement of Oil Filter – Protecting engine components by maintaining clean oil circulation.

  7. Replacement of Alternator Belt – Ensuring proper alternator operation for charging and electrical performance.

  8. Replacement of Injection Nozzle Including Washer – Enhancing fuel injection efficiency.

  9. Replacement of Water Pump + Gasket – Maintaining optimal coolant flow and preventing leaks.

  10. Replacement of Coolant – Preventing overheating and corrosion within the cooling system.

  11. Replacement of Tube & Tee Fitting – Ensuring secure and leak-free connections.

  12. Replacement of Rocker Arm Cover Gasket – Preventing oil leaks from the rocker arm assembly.

  13. Replacement of Sender Oil Pressure – Monitoring and regulating oil pressure for engine protection.

  14. Performance Test – Diesel Fire Pump – Verifying the diesel pump’s capability to deliver adequate flow and pressure.

  15. Performance Test – Electric Fire Pump – Ensuring the electric pump’s reliability under operational conditions.

Purpose of Maintenance and Testing

  1. Ensuring Reliability: Confirming the fire pumps are ready for operation in case of an emergency.

  2. Compliance with NFPA Standards: Meeting NFPA 25 requirements for fire safety system maintenance.

  3. Performance Validation: Testing the systems to verify optimal performance and operational readiness.

  4. Preventive Maintenance: Addressing wear and tear to prevent unexpected failures and prolong equipment lifespan.

Commitment to Quality and Safety

PT. Pro Engineering Utama is dedicated to providing comprehensive maintenance and testing services for fire protection systems. Our team ensures that all equipment meets industry standards and operates efficiently to safeguard facilities and personnel.

For more information about this service or to schedule an inspection, please contact PT. Pro Engineering Utama through the provided contact details.

.

Share

Related posts

December 30, 2024

Replacement Diesel Fire Pump Controller – AirNav Indonesia


Read more
December 18, 2024

Maintenance Fire Pump – PT. Apical Kao Chemicals, Dumai


Read more
December 11, 2024

Repair of Fire Truck Rosenbauer RU III Plaju


Read more

Office
Ruko Palais de Paris Blok F2 No 12
Deltamas Cikarang Pusat Bekasi Jawa Barat
Indonesia 17530
Tel : (021) 89383685
Fax : (021) 29082419
Whatsapp : +62 878 8887 6666

Our Service
Fire Service
Water Work & Irrigation
Residential & Commercial Building Service
Automotive

© 2025 PT. PRO ENGINEERING UTAMA. All Rights Reserved.
    0