PT. PRO ENGINEERING UTAMA
  • Home
  • Our Product
    • Shop
  • Our Service
    • Fire Service
    • Water Works & Irrigations
    • Residential and Commercial Building Service
    • Automotive
  • News
  • About Us
  • Contact Us
0
Supply and Commissioning Masdaf Fire Pump – Bank Mandiri Tasikmalaya
February 6, 2026

Assessment Fire Pump – PT PERTAMINA Geothermal Energy – Karaha

0-3968x2976-0-0#

Assessment Fire Pump – PT PERTAMINA Geothermal Energy – Karaha

On November 4th, 2025 PT Pro Engineering Utama 

An assessment of the fire pump system was conducted at Pertamina Geothermal Energy (PGE) Karaha in accordance with applicable NFPA standards, including NFPA 20 for the installation, inspection, and condition evaluation of stationary fire pump systems. The purpose of this assessment was to evaluate the operational condition, reliability, and readiness of the fire protection system to support emergency response requirements.

Assessment Findings

The assessment activities were carried out smoothly and in an orderly manner. During the inspection and functional checks, it was identified that the fire pump engine experienced certain operational issues. Several components were found to be not performing optimally and require replacement of specific parts to restore full compliance and reliable operation. These findings indicate that while the system remains functional, corrective actions are necessary to meet NFPA performance and reliability criteria.

Conclusion and Recommendations

Based on the assessment results, it is concluded that the fire pump system at PGE Karaha requires replacement of several components to ensure full compliance with NFPA standards and to maintain dependable operation under emergency conditions. It is recommended that the identified parts be replaced promptly, followed by re-testing and commissioning to verify system performance before being declared fully ready for service.

Share

Related posts

February 6, 2026

Supply and Commissioning Masdaf Fire Pump – Bank Mandiri Tasikmalaya


Read more
December 11, 2025

Hydrant Maintenance – PT PLN UBP Jambi Unit PLTMG & CNG Plant Sei Gelam


Read more
December 10, 2025

Assessment PMK – PT PERTAMINA PATRA NIAGA – ITC LPG Cilacap


Read more

Office
Ruko Palais de Paris Blok F2 No 12
Deltamas Cikarang Pusat Bekasi Jawa Barat
Indonesia 17530
Tel : (021) 89383685
Fax : (021) 29082419
Whatsapp : +62 878 8887 6666

Our Service
Fire Service
Water Work & Irrigation
Residential & Commercial Building Service
Automotive

© 2025 PT. PRO ENGINEERING UTAMA. All Rights Reserved.
    0